Air Charter Services from India

Full and part air charters from Indian gateways when scheduled capacity will not do — AOG, oversized pieces, project deadlines and relief cargo.

When a charter is the cheaper option

A charter looks expensive next to a scheduled airway bill until you price the alternative. A production line stopped for a week, a vessel held at berth on demurrage, a tender missed because the goods landed two days late — these cost more per day than the difference between a charter and a consolidation. The question is never “is a charter expensive”; it is “what does the delay cost, and for how many days”.

The cases that genuinely justify one are narrow and recognisable. Aircraft-on-ground spares, where an airline or MRO is losing a hull per day. Project cargo whose dimensions or weight exceed what a passenger belly or a scheduled freighter will accept. Time-critical pharmaceutical or perishable consignments where the scheduled routing adds a transhipment and a temperature excursion. Relief and government consignments moving against a fixed window. And peak-season capacity crunches, when the space simply is not there at any rate.

We quote charters against the scheduled alternative rather than in isolation, and we will tell you when the scheduled option is good enough. A charter booked because nobody checked the freighter schedule is money burned.

What we arrange, and in what order

A charter is an assembly of permissions, not just an aircraft. The sequence matters because each step gates the next, and a charter that misses its slot loses its economics.

First the aircraft: type, configuration and availability against your weight, dimensions and window. An An-124 and a B747F solve different problems, and a 3.2-metre-high piece rules out most of the fleet before price enters the conversation. Then the operating permits — overflight and landing clearances for every state on the routing, which for a westbound flight out of India can mean four or five separate authorities. Then the ground side: slot times at both ends, ULD or floor-loading plan, loading equipment, and the customs file.

Indian departures add their own steps. The shipping bill is filed through ICEGATE against your IEC and the AD code registered at that specific airport — a code registered at Delhi does not work at Mumbai. Cargo must be physically presented and examined at the terminal before the aircraft is loaded, and at the busier gateways that presentation has its own queue. We build the timeline backwards from the wheels-up slot so the customs step is never the thing that misses it.

Gateways and what each is good for

India has no single best charter gateway; the right one depends on where the cargo is and what it weighs. Delhi (DEL) has the deepest freighter handling and the widest permit experience, and is the default for anything northbound or heading to Europe and Central Asia. Mumbai (BOM) serves western India and the Gulf, and is the gateway most engineering and pharma shippers already have an AD code at.

Chennai (MAA) and Bengaluru (BLR) work for southern manufacturing and the automotive and electronics corridors. Cochin (COK) is convenient for Kerala-origin cargo and for consignments moving to the Gulf. Hyderabad (HYD) has become the pharmaceutical gateway, with cold-chain infrastructure the others cannot match.

Trucking the cargo to a better-equipped airport is often cheaper than chartering out of a closer one. We price both, because the answer is not obvious and depends on the piece dimensions, the road permits and the ramp equipment available at each end.

What actually moves the price

Charter pricing is driven less by distance than by positioning. An aircraft already ending a rotation near your origin costs a fraction of one that must fly in empty from another continent. That is why lead time matters so much: two weeks of notice lets us find a repositioning aircraft, two days does not.

  • Aircraft positioning — an empty leg to reach you is billed to you
  • Aircraft type and whether your piece forces a larger hull than the weight alone would
  • Overflight and landing permits, which vary enormously by routing and are non-negotiable
  • Slot availability at both ends, and any night-curfew restrictions
  • Ground handling and specialised loading equipment, particularly for outsized pieces
  • Fuel, and whether the routing needs a technical stop
  • Whether the return leg can be sold — a backhaul materially reduces your cost

Documentation, and the two that delay charters

A charter runs on the same export documents as any air consignment: commercial invoice, packing list, shipping bill filed through ICEGATE, and the airway bill. Where charters differ is that a documentation problem cannot be absorbed by rolling to the next flight, because there is no next flight.

Two items cause most charter delays out of India. The first is the AD code: registered per-port, and shippers who normally move through one gateway routinely discover on the day that it is not registered at the airport the charter is departing from. Registration is quick but not instant, and it must be done before the shipping bill can be filed. The second is dangerous-goods classification discovered late. A lithium battery, an aerosol, a pressurised component or a flammable adhesive inside a machine changes the packing, the documentation and sometimes the aircraft. We ask about DG in the first conversation rather than the last.

Insurance and liability on a charter

Carrier liability on an airway bill is limited by the Montreal Convention to 22 SDR per kilogram — a few thousand rupees for a spare worth a crore. That limit applies on a charter exactly as it does on a scheduled flight, and it is the single most misunderstood point in air freight.

For anything where the value materially exceeds the weight, we arrange all-risks marine cargo insurance covering the declared value door to door, including the road legs at both ends and any period in a terminal. Premiums on high-value air consignments are small against the exposure, and the claim process is materially easier when the policy was written before the cargo moved rather than after something happened to it.

Asked often about this service

How quickly can a charter actually depart from India?

With everything in order and an aircraft available regionally, seventy-two hours is realistic and forty-eight is possible. The constraints are rarely the aircraft — they are the overflight permits for the routing and, on the India side, the AD code registration and the physical customs examination. We start the permit applications and the ICEGATE filing in parallel on day one rather than in sequence.

Can we charter part of an aircraft rather than all of it?

Yes. Part-charter is common and much cheaper, and works when your cargo needs a specific window or a specific aircraft type but does not fill the hull. You share the aircraft with other consignments moving on the same routing. The trade-off is less control over the exact departure time, since the flight goes when the load is complete.

What size and weight can actually be flown out of India?

On a B747F the practical limit through the nose door is around 3.1 metres high by 3.4 metres wide, with individual pieces to roughly 40 tonnes depending on floor loading. An An-124 takes pieces to about 4.4 metres high and 120 tonnes. Above that, the answer is ocean breakbulk, and we would tell you so rather than sell you a charter that cannot lift it.

Do you handle the import clearance at the destination too?

Yes, through our partner network — and it matters more on a charter than on a scheduled flight. A charter typically lands outside normal cargo hours at an airport with no standing arrangement for your goods, so the receiving broker, the ground handler and the onward transport all need to be booked before the aircraft departs India, not after it lands.

Ready when you are

Get a surveyed, written quote for your move.

Tell us what is moving and where. A coordinator comes back with a practical plan and an itemised quotation — free, no obligation, usually within one working day.