Project Cargo & Heavy Lift Logistics
Oversized, heavy and project consignments — planned with route surveys, lifting studies and permits, and moved on the right equipment for each leg.
Plan a project cargo move
Dimensions, weights, the centre of gravity and the dates. A project enquiry is a study rather than a rate, so we tell you what the plan needs and when you will have it.
Your enquiry is with us.
A coordinator will come back with a routing and quotation, usually within one working day.
Project cargo is what happens when the shipment will not fit in a container and cannot be treated as freight in the ordinary sense — a transformer, a pressure vessel, a piece of plant, a complete production line. These moves are engineering exercises before they are transport exercises, and the planning is where they are won or lost.
We plan and execute over-dimensional and heavy-lift movements end to end: surveying the route, studying the lifts, arranging the movement permits and escorts, and matching each leg to the right equipment — flat-rack and open-top containers, breakbulk on conventional vessels, roll-on/roll-off, or specialised road trailers for the inland legs. The aim is a move where every constraint has been found on paper before the cargo is on the road.
What you get with this service.
Route survey
The inland route checked for real — bridge limits, turning radii, overhead clearances, weak culverts — so a trailer does not meet a bridge it cannot cross with the cargo already loaded.
Lifting & method
Lift studies and a method statement for how the cargo is picked, secured and set down at each transfer, with the crane or gear specified for the weight.
Movement permits & escorts
Over-dimensional movement permits, police and pilot-vehicle escorts, and the timing windows that heavy loads are restricted to.
Multimodal execution
The right mode for each leg — breakbulk, RORO, flat-rack, or heavy road trailer — coordinated so the cargo is not stranded between two of them.
The plan is the product
With ordinary freight, you book and it moves. With project cargo, the booking is the last thing that happens. First the cargo is measured and weighed exactly, because a trailer’s route is decided by centimetres and a vessel’s stowage by tonnes. Then the route is surveyed — not on a map, but physically, for the bridge that will not take the axle load and the roundabout the trailer cannot get around. Then the lifts are studied, the permits applied for, and only then is the move scheduled.
Skip any of that and the failure is expensive and public: a load that cannot pass a bridge with the cargo already on it, a crane that turns out to be under-rated, a permit that was not in hand when the escort arrived. We would rather spend the time on the plan.
One coordinator across many parties
A project move pulls in more parties than any other — the shipper, the crane operator, the road-permit authorities, the police escort, the port, the vessel, the receiver. The single most valuable thing we provide is that one person holds all of it, so the crane and the trailer and the permit and the sailing line up on the same day rather than each being someone else’s problem.
Insurance and risk
A project consignment concentrates a great deal of value into one indivisible object, and the ordinary assumptions of cargo insurance do not always fit it. A transformer or a fabricated vessel cannot be part-shipped, cannot be easily replaced, and in many cases cannot be repaired locally if it is damaged in transit — so the exposure is not the freight cost but the delay to the entire project behind it.
We arrange marine cargo cover appropriate to the piece rather than a generic percentage, and where the value or the method warrants it we bring in an independent surveyor to witness loading, lashing and discharge. That survey record is what settles a claim quickly if one is ever needed, and more often it is what prevents the claim: a lashing arrangement questioned on the quay is cheaper than a repair in another country.
Choosing the mode for an out-of-gauge piece
The first real decision on a project move is not the carrier — it is the form the cargo will travel in. A piece that exceeds container height or width but is still within the reach of ordinary quay cranes usually goes on a flat-rack or an open-top, and the arithmetic there is that you pay for the slots the overhang blocks as well as for the equipment itself. Two or three sacrificed slots can turn what looked like the cheap option into the expensive one, so the comparison has to be run properly rather than assumed.
Once the piece is beyond container geometry, it becomes breakbulk on a multipurpose vessel, stowed in the hold or on deck and worked by the ship’s own gear or by shore cranes rated for the lift. Where the weight is beyond either, a heavy-lift vessel with purpose-built gear is the answer, and those sail on their own rhythm — the booking is against a laycan window rather than a weekly service, which changes the whole planning horizon.
Anything wheeled, tracked or capable of sitting on a roll trailer is often best on a roll-on roll-off service, and it is worth saying why: the piece is never suspended. No lift means no lifting risk, no lashing points taking a load they were not designed for, and generally the gentlest journey available. For a site with its own jetty or river access, a coastal barge leg can also take the worst road section out of the plan entirely.
The road between the port and the site
The ocean leg is rarely the hard part of a project move. The hard part is the fifty or hundred kilometres between the quay and the foundation. Bridge load ratings and culverts that were never designed for a modular trailer. Level crossings with a gradient the load cannot take. Overhead power and traction lines that need the utility involved and a shutdown window agreed weeks ahead. Toll plaza islands and central reservations that have to be temporarily removed and reinstated. Village turns where the geometry simply does not work and a bypass has to be cut.
None of that is discovered on a map. A physical route survey drives the whole corridor with the actual dimensions in hand, photographs the pinch points, and produces a list of obstructions with a fix and a cost against each. That list is what the movement plan is built on, and it is also what makes the difference between a quotation that holds and one that grows by a third once the trailer is loaded and the first bridge turns out to be a problem.
Approvals follow the same logic. An over-dimensional movement permit is issued state by state, and a load crossing three states needs three of them — with different conditions, different validity periods and different escort requirements that do not conveniently expire together. Night-only movement windows, police and pilot-vehicle availability, and local restrictions around festivals or examinations all constrain when the load may actually roll. Sequencing those approvals so they overlap rather than lapse is a large part of the planning work.
A realistic timeline, working backwards
Project moves are planned in reverse, from the date the equipment has to be standing on its foundation. Behind that date sit the site access works and the receiving crane, the escorted road movement and the windows it is confined to, the discharge and any port storage, the sea leg and the vessel booking window, the loading and lashing survey, the approvals, the physical route survey, and — at the very beginning — the feasibility study that says which mode the piece can travel in at all.
Each of those has a lead time that is not negotiable by wanting it more. Route surveys take days on the road and longer to write up. Approvals take as long as the slowest of the states involved. Specialised trailers and heavy-lift tonnage are finite and get committed to other projects. On the west coast, coastal and barge work is effectively suspended through the south-west monsoon between June and September, and a plan that ignores that is a plan with a three-month hole in it.
The other date worth being honest about early is fabrication. Heavy equipment is very often not ready on the day the drawings said it would be, and a move planned tightly against an optimistic readiness date loses its approvals, its trailer and its vessel slot at the same time. We would rather build the plan around the date the piece will genuinely be on its skids, with the slack visible, than rebook the whole chain twice.
| Mode | Suits | The trade-off |
|---|---|---|
| Flat-rack or open-top | Over-height or over-width pieces within crane reach | You pay for the slots the overhang blocks as well as the unit |
| Breakbulk | Pieces beyond container geometry | Sailing frequency is thinner and stowage has to be planned |
| Heavy-lift vessel | Weights past ordinary shore and ship gear | Booked against a laycan window, not a weekly schedule |
| Roll-on roll-off | Wheeled, tracked or trailer-borne pieces | Needs a suitable ramp and berth at both ends |
| Coastal barge | Sites with jetty or river access | Weather-dependent and suspended through the monsoon |
Questions we are asked a lot.
What counts as project or heavy-lift cargo?
Anything that exceeds the limits of standard containerised carriage — over-width, over-height, over-length or over-weight — or that needs special handling to lift and secure. If you are not sure whether your cargo qualifies, send us the dimensions and weight and we will tell you what it needs.
How far ahead should we start planning?
Earlier than most people expect. Route surveys, permits and specialised equipment all have lead times, and permit windows and escort availability can constrain when a load may move. The cargo being ready is rarely the bottleneck — the approvals are. The sooner we start, the more options stay open.
Do you handle the lifting as well as the transport?
We plan and coordinate the lifts as part of the move — the method, the gear rating and the securing — working with crane and rigging specialists. The point of a single coordinator is that the lift and the transport are planned together, not booked by two parties who each assume the other has it covered.
What do you need from us to quote a project move?
Dimensions and gross weight for each piece, the centre of gravity, and the marked lifting and lashing points — those four decide the mode, the gear and the trailer configuration. General arrangement drawings help enormously. Beyond the cargo itself: the collection point and how a trailer gets into it, the delivery site and the same question, the date the equipment will genuinely be ready, and the date it has to be standing on its foundation. Anything missing at that stage becomes an assumption, and assumptions on project cargo are expensive.
Can heavy cargo move during the monsoon?
Road movements can, with caution — reduced speeds, more attention to ground bearing at hard standings and lay-bys, and a real risk of a route becoming impassable at short notice. Coastal barge work and open-deck loading on the west coast are a different matter and are largely off the table between June and September. Where a project date falls inside that window, the sensible move is usually to shift the sea leg rather than the site date, and to say so early enough that it is still a choice.
Who confirms a bridge will take the load before it gets there?
The route survey does, against the structure ratings held by the road authority and, where a rating is missing or doubtful, by referring the structure for assessment before anything is committed. It is done on paper and on the ground before the load is built, not tested by driving onto it. Where a bridge will not take the piece, the plan changes — a longer detour, a temporary bypass, or a different discharge port — and it changes while it is still a line in a schedule rather than a stranded trailer.
The rest of what we move.
International air freight
Fast, dependable air cargo for urgent and time-sensitive shipments worldwide.
International sea freight (FCL & LCL)
Cost-effective FCL and LCL services for imports and exports across global trade routes.
Customs clearance & trade compliance
Documentation, clearance and compliance support that keeps cargo moving.
Warehousing & distribution
Secure storage, inventory management and distribution built around your supply chain.
Door-to-door logistics
End-to-end management from the supplier’s floor to the final destination.
Packing, office moves & mobility
Professional packing, office moves, employee mobility and household goods.
Specialist project cargo & heavy lift services
The parts of this service that get asked about most often, each covered properly.
Heavy Lift Shipping from India
Cargo too heavy for a container and too valuable to improvise — planned as an engineering job, not a booking.
ODC and Over-Dimensional Cargo Transport in India
Over-dimensional consignments moved by road across India, with the route surveyed and the permits obtained before the trailer is b…
Get a quote for project cargo & heavy lift.
Tell us the lane and the cargo. A freight coordinator comes back with a routing and an itemised quotation, usually within one working day. No obligation.
- Itemised quotation — every line explained
- Carrier-neutral routing, chosen for your cost
- In-house customs filing at both ends
- One named coordinator per file
Movers and packers for everything a standard move leaves out.
Pets, vehicles, fine art, the office, the things that need storing first — one coordinator, one written quote, whichever of these your move needs.
- Pet movers IATA crating, vaccination and quarantine rules, a flight your pet can take.
- Vehicle movers & packers Cars and two-wheelers shipped abroad, import rules explained first.
- Art & antiques movers Crated, declared and insured for what it is worth.
- Car transport in India On a carrier between cities — condition-reported, never driven.
- Bike transport in India Packed, crated and carried, with a GST invoice.
- Office movers & packers Workstations, IT and files moved over a weekend, back up on Monday.
- Storage Household and commercial storage between one home and the next.
- Customs clearance Export filed in India, import cleared at the destination.
Tell us what you are shipping.
Send us the cargo, the origin and destination, and the date you need it there. We will come back with a practical routing and a clear quotation — not a form letter.